微信扫一扫联系客服

微信扫描二维码

进入报告厅H5

关注报告厅公众号

89

ITIF-氢枢纽难题:如何为生态系统提供资金(英)-2022.9

# 氢枢纽 # 生态系统 大小:0.25M | 页数:11 | 上架时间:2022-09-18 | 语言:英文

ITIF-氢枢纽难题:如何为生态系统提供资金(英)-2022.9.pdf

ITIF-氢枢纽难题:如何为生态系统提供资金(英)-2022.9.pdf

试看5页

类型: 行研

上传者: 范泽林

撰写机构: ITIF

出版日期: 2022-09-18

摘要:

▪ DOE must fund the hydrogen production plant at the core of each hub at a cost of about $250 million–$500 million each, with a 50 percent private sector cost share.

▪ Capital expenditures on associated infrastructure, such as hydrogen delivery systems, should also be supported by DOE, using the same 50 percent cost share.

▪ As the core plant ramps up, DOE may need to support its operating expenses to accelerate the growth of sustainable end-use markets. But it should be careful not to extend these subsidies much beyond when the plant reaches full-scale operation.

▪ DOE should also avoid subsidizing infrastructure operations, and it should not subsidize end users except to seed specific markets temporarily. Ongoing subsidies are inconsistent with the hubs’ mission of demonstrating sustainable markets.

▪ DOE funding should not flow through each hub’s organizing entity to specific hub projects. Instead, the organizers should include all related projects in their proposals, but DOE should fund projects directly, set the terms, and oversee them.

▪ Finally, DOE should explore ways to help de-risk hubs and associated demonstration projects in other ways. For example, the volatility of energy prices presents a key risk. DOE should explore ways to insure or hedge against this and other risks.

展开>> 收起<<

请登录,再发表你的看法

登录/注册

范泽林

相关报告

更多

浏览量

(89)

下载

(0)

收藏

分享

购买

5积分

0积分

原价5积分

VIP

*

投诉主题:

  • 下载 下架函

*

描述:

*

图片:

上传图片

上传图片

最多上传2张图片

提示

取消 确定

提示

取消 确定

提示

取消 确定

积分充值

选择充值金额:

30积分

6.00元

90积分

18.00元

150+8积分

30.00元

340+20积分

68.00元

640+50积分

128.00元

990+70积分

198.00元

1640+140积分

328.00元

微信支付

余额支付

积分充值

填写信息

姓名*

邮箱*

姓名*

邮箱*

注:填写完信息后,该报告便可下载

选择下载内容

全选

取消全选

已选 1